Phase III – Shkopet HPP Project
The third phase marks the completion stage of the project, involving full installation and operational setup of the new turbines:
• Installation of two new 13.3 MW turbines;
• Assembly of the runner, generator, and all auxiliary systems;
• Installation of the DTL, drainage pumps, and other essential components for full operational capability;
• Final testing and commissioning to ensure safe and efficient operation of the system.