Rehabilitation of Support Bearings – Vau Dejes HPP

Location Vau Dejes
Technological Upgrade of Generation Components

Novamat contributed to the long-term rehabilitation and technological upgrade of the support bearings for the turbines at Vau Dejes Hydropower Plant.
• Capacity: 5 x 50 MW – Franchis Turbines
• Location: Vau Dejes HPP
• Project Duration: 2017 – 2022

The project included condition assessment, engineering design of technical solutions, supply of advanced technology equipment, and professional installation of new bearing components to ensure improved performance and extended operational lifespan of the system.